We are having the driveway redone during Mid-Winter Break. They are putting in a French drain to move the water off the driveway, and digging into the hill side to widen the driveway and installing a retaining wall. The walls will continue to the end of the drive with lights at the bottom of the driveway on each side. A lane for traffic will be kept open for parents during the break. They will start in the afternoon on February 14th and plan to be done by February 24th!